After the sand table model is packed, it is necessary to preliminarily transport the sand table model for a long distance. So what problems should we pay attention to in the transportation process? How to take out the sand table model safely after the delivery arrives at the destination?
1. In general, it is better to choose the special delivery and road transportation methods. For large equipment models requiring long-distance transportation, the safety and reliability of container packaging transportation is better than other bulk transportation methods. For the transportation of selected cars, sandbags must be used in the trunk for weighting to ensure the stability during the trek operation.
2. It is better to select a method that can deliver things directly to the destination for the transportation of journey model, and try to avoid reducing the probability of midway transshipment.
1. Model unpacking procedure.
a. Check the appearance of the food model box; b. Open the box cover; c. Suspend the model layering and temporary reinforcement equipment in the box; d. Take out the model; e. Correct the withered parts of the model; f. Model checking; g. Clean up the dust; h. Model assembly; i. Hand over to users.
2. The sandbox model shall be unpacked separately according to the numbering procedure, and the packing box can be discarded only after the unpacked model is reset, cleared, repaired and corrected without any defect.
3. The sand table model in layers and sections shall be reset according to the marks during packaging, and the marks and temporary reinforcements set for packaging and transportation shall be removed, and the withering parts shall be permanently fixed with adhesives.
4. After all the single models have been reset, corrected and cleared, the waste sand table models can be put into the storage room, assembled as a whole in succession, and checked as a whole in succession. After confirmation, they can be handed over to the user.
Before manufacturing the base of the sand table model, the following points should be acknowledged:
1. Base standard: a gap should be set between the building, model planning and the surrounding environment to highlight the model from the surrounding environment. And whether the base should be consistent with the building in the air.
2. Degree surface: base fit 00 degree surface, create terrain or buildings on it so that its parts can be clearly seen. And the base is the support of the terrain, so that it can be manufactured continuously.
3. Contour line and ground floor construction, data and construction methods of fixed parts on the building body and base. In addition, reflect the following areas of the foundation level: foundation, puncturing garage, puncturing passage, etc.
4. Data, structure and manufacturing of the base: how much stability must it adhere to? How much does it have to weigh? Is the technical equipment address of equipment such as lighting equipment, transformers, etc. necessary?
5. In order to reflect the deeper area, it is required to make holes in the base.
6. Disposal of appearance.
7. The completion word is the text part and necessary description included in the model.
8. The delivery of the model is related to the problem of whether the protective sleeve can be disassembled or not.
The shape and size of the sand table model base is not only related to the scale built by the model and the share of the model, but also closely related to whether we can present the planning sketch separately or with the overall adherence. Therefore, we should not be careless in planning and manufacturing.